Used to break down the ground head concrete of foundation pile.
SP400, SP500, SP600-8
1 Year.
1: Easy assembly and operation.
2: Safeoperation: workers no need to touch the pile, can just operate the excavator or power pack.
3: Safe and reliable, without any impact on the pile body.
4: Small size: lightweight and convenient transportation.
5: Environmental protection: Low-noise, does not affect the surrounding environment during construction.
1: High efficiency: can cut 120 to 160pcs piles per day.
2: Less staffing, reduce labor costs.
3: Greatly shorten the construction period.
4: Simple machine maintenance and low maintenance cost.